Daniel wastes no time in attacking the project from all angles. This in precis is what has been achieved in four days on the job. Rock face behind house levelled off, area for pergola cleared, building supplies arrive and lounge wall built, lintels in place for new doorways and windows, wall constructed in master bedroom, rendering of lounge walls, ordering of new doors and windows and beams for the lounge roof, plastering over the bamboo between beams in third bedroom, making doorways by drilling through metre thick walls as well as gouging out channels for electricity . Not bad for four days work really. Myself I have been out and around scouting the area and checking out stores. On Tuesday bought, fridge, stove top, oven and washing machine ready for Daves imminent arrival so that he can buld kitchen around them. Found a great Butler sink (double) to finish the kitchen buying. Also on a trip to Huercal Overa, the next major town after Albox and very Spanish, found a great granite and marble factory tucked awayin a side street and the father and son (who spoke broken English), with great patience, showed me the different types of granite and marble. They recommended the cheaper granito nacional as a counter top and explained it would cost 100 euros per linear metre with all cutouts, travelling costs and installation included in that price. Not bad.
Friday, July 16, 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment